Liwen Paper Manufacturing Renovation Project - Installation of rewinding machine
Supplier: ACELLI
Annual production: 400000 tons
Net width: 6650mm
Vehicle speed: 1100m/min
Project scope:
1. PM3 slurry box renovation (including related pipelines, electrical instruments, non-standard)
2. PM7 Coating System and Drying Cadre Renovation (including related pipelines, electrical instruments, non-standard)
3. PM9 scraper modification, PM12 scraper modification
4. PM15 drying cadre renovation (change order hanging: including related pipelines, electrical instruments, non-standard)
5. PM7 slurry box renovation (including related pipelines, electrical instruments, non-standard)